Case Study Brief
The Logistics Challenge
The 15,000 m² order of 1.5 mm GSE® HDPE geomembrane needed delivery coordination with the Karowe project programme. Material availability, dispatch readiness and Botswana receipt arrangements had to remain aligned.
The supply scope connected the specified product, consignment preparation and delivery arrangements. Manufacturer documentation supported the material checks, with field installation treated as a separate scope.
Logistics Route & Transit
How this consignment moved from order to site, stage by stage.
Route Timeline
Order and material schedule
Verify specified grades, dimensions and quantities against the project order.
Consignment preparation
Coordinate material identification, packing, loading and the required shipment documents.
Cross-border delivery coordination
Coordinate the required export, import and transport arrangements for the destination country.
Project-site receipt
Check the received material against the consignment and order; retain receipt and traceability records.
Products Supplied
Products supplied for this project.
“In-house project comment: For Karowe, our focus was to connect the specified liner, supply readiness and delivery programme. One coordinated supply scope helped the site plan its installation activities.