Case Study Brief
The Logistics Challenge
The Botswana order combined 21,560 m² of 1.0 mm and 40,040 m² of 2.0 mm HDPE geomembrane. The logistics task was to keep the thicknesses, quantities and consignment identification aligned from order preparation to receipt at Ikongwe.
Procurement, roll identification, consignment preparation and Botswana delivery arrangements were coordinated around the material schedule. The delivered quantities remain the primary measurable project proof.
Logistics Route & Transit
How this consignment moved from order to site, stage by stage.
Route Timeline
Order and material schedule
Verify specified grades, dimensions and quantities against the project order.
Consignment preparation
Coordinate material identification, packing, loading and the required shipment documents.
Cross-border delivery coordination
Coordinate the required export, import and transport arrangements for the destination country.
Project-site receipt
Check the received material against the consignment and order; retain receipt and traceability records.
Products Supplied
Products supplied for this project.
“In-house project comment: For Ikongwe, the proof is the material schedule: 61,600 m² supplied in two specified thicknesses. Our coordination connected the order, roll identification and cross-border delivery as one supply scope.