IAGI Installer Member

FlowTex GSC NW Nonwoven Sand Containers

Nonwoven geosynthetic sand containers for coastal revetments, dune protection, scour defence and shoreline rehabilitation across African coastlines. Seven grades from 40kg flood-response units to 4,000kg breakwater core bags, manufactured in our own Johannesburg facility from virgin-grade polypropylene continuous filament needle-punched nonwoven geotextile. Custom dimensions, fabric weights and seam configurations to order.

View Spec Sheet

Technical Specification of FlowTex GSC NW Nonwoven Sand Containers

Nonwoven geosynthetic sand containers are engineered marine and hydraulic armour units, fabricated from needle-punched continuous filament polypropylene and filled on site with local sand to form monolithic, permeable, high-mass placed elements. They are specified for coastal revetments, dune-toe and cliff-toe protection, harbour scour defence, riverine bank reinforcement and shoreline rehabilitation. Seven grades, 40kg to 4,000kg.

Nonwoven is the correct construction wherever the container meets irregular or sharp substrate, rock armour or angular fill. Three properties govern. The entangled fibre structure spreads point loads across a diffuse contact area rather than into individual yarns, giving CBR puncture of 2.40 to 11.30 kN (EN ISO 12236). Elongation of 68 to 105 percent (EN ISO 10319) lets units deform and interlock as the structure settles. And opening size of 110 down to 70 micron (EN ISO 12956) retains fine coastal sand that a coarser woven fabric would pass.

Fabric is 100% virgin-grade polypropylene continuous filament - never recycled, regenerated or blended stock, which carries inconsistent molecular weight, uncontrolled additive migration and embrittled fibre segments. Published performance: chemical resistance above 90% (EN 14030), microbiological above 95% (EN 12225), weathering above 90% (EN 12224), UV strength retention 70 to 80% after 500 hours (ASTM D4355).

The range is cut, stitched and seam-tested in our own Johannesburg facility, so container geometry, fabric weight and closure specification are design variables rather than catalogue constraints - a non-standard footprint or a heavier cloth on a standard footprint is a production run, not an import lead time. All closures are double-seamed in UV-stabilised yarn, verified to EN ISO 10319. Single straight-seam closures are not supplied.

Every container ships with mill test certificates, independent third-party test data and full batch traceability against EN ISO 9864, 10319, 12236, 13433, 11058 and 12956, plus ASTM D4355. Manufacturing runs under ISO 9001:2015. Installation is executed under IAGI-aligned QA/QC with photographic sign-off at each course before the next is placed.

Typical Values for GEOSYNTHETIC SAND CONTAINERS

Function
Revetment · Dune · Scour · Riverine
Grades
NW40 → NW4000
Filled Mass
40 kg → 4,000 kg
Fabric
Virgin PP · Needle-Punched Nonwoven

Properties & Dimensions

GradeLay-FlatFilled MassFabric TensileCBR PunctureO90Application
NW400.60 × 0.40 m40 kg200 g/m²16 kN/m2.40 kN110 µmFlood response
NW700.80 × 0.50 m70 kg200 g/m²16 kN/m2.40 kN110 µmFlood response
NW70HD0.80 × 0.50 m70 kg300 g/m²21 kN/m3.60 kN90 µmRiverine erosion
NW4001.30 × 0.85 m400 kg800 g/m²55 kN/m9.20 kN80 µmLow-energy coastal
NW13501.80 × 1.50 m1,350 kg800 g/m²55 kN/m9.20 kN80 µmMedium-energy coastal
NW18002.36 × 1.45 m1,800 kg800 g/m²55 kN/m9.20 kN80 µmHigh-energy coastal
NW40002.50 × 2.00 m4,000 kg1,200 g/m²80 kN/m11.30 kN70 µmExtreme / breakwater

Popular Catalogue Items

FlowTex™ GSC NW - Nonwoven Geosynthetic Sand Containers

FlowTex™ GSC NW - Nonwoven Geosynthetic Sand Containers

40 kg to 4,000 kg , Tenara® UV-stable ePTFE thread

Related Product Groups

Three Questions To Ask Before You Order

1.How do I size a container against my design wave height?
Required unit mass follows from significant wave height by the same route as rock armour, then the grade follows from the mass. As an order of magnitude on placed nonwoven units: 400kg for low-energy coastal and structural riverine, 1,350kg for medium-energy exposure, 1,800kg for high-energy revetment and groyne work, 4,000kg for extreme energy and breakwater core. Those bands are a starting point, not a design. Send us design wave height, water levels, slope geometry and a fill grading and our engineering team will return sizing, stacking geometry and toe embedment depth against your project conditions.
2.What should the specification clause actually say?
Five things, in this order: fabric construction (needle-punched continuous filament nonwoven polypropylene), minimum fabric mass in g/m², minimum CBR puncture to EN ISO 12236, maximum characteristic opening size to EN ISO 12956 matched to the fill grading, and minimum seam strength to EN ISO 10319 with a double-seam closure requirement. Specifying filled mass alone is the most common gap we see - it leaves opening size and seam closure open, which are the two things that determine whether the structure survives.
3.Will the fabric retain my site sand?
Characteristic opening size across the range runs 110 down to 70 micron, which retains the fine to medium sand grading found on most African coastlines. The check is against your fill: material finer than the container O90 will pass under wave-induced flow and produce gradual mass loss and settlement. Send a grading curve before the specification is issued and we will confirm the match or tell you the fill needs screening. This check is the reason nonwoven is specified over woven on fine-sand sites.
4.What test data is supplied with delivery?
Mill test certificates and independent third-party test data covering EN ISO 9864 (mass per unit area), EN ISO 10319 (wide-width tensile and seam strength), EN ISO 12236 (CBR static puncture), EN ISO 13433 (dynamic cone drop perforation), EN ISO 11058 (water permeability), EN ISO 12956 (characteristic opening size), EN 14030 (chemical resistance), EN 12225 (microbiological resistance), EN 12224 (weathering) and ASTM D4355 (500-hour UV resistance), with full batch traceability against delivery. Manufacturing runs under ISO 9001:2015.
5.What is the design life, and what governs it?
The fabric is virgin-grade UV-stabilised polypropylene with published chemical resistance above 90% (EN 14030), microbiological resistance above 95% (EN 12225), weathering resistance above 90% (EN 12224) and UV strength retention of 70 to 80% after 500 hours (ASTM D4355). On an exposed coastal structure, service life is governed less by the polymer than by installation: toe embedment depth, fill ratio, seam closure and stretcher bond. A correctly installed structure outlives a poorly installed one by decades on identical fabric, which is why we install under photographic QA/QC sign-off rather than supplying and leaving.
6.When should I specify woven instead?
Where the container carries wide-width tensile load between placed units and where rapid pore-pressure dissipation through the tidal cycle governs - groyne heads, scour aprons and long structural revetment runs. Woven delivers roughly twice the tensile strength at a third of the fabric mass. It gives up elongation, so it resists rather than conforms, and its opening size of 300 to 600 micron will pass fine sand. On sharp or irregular substrate, on fine fill, or where units must deform to interlock, nonwoven is the correct specification.
7.Can you manufacture a size or fabric weight that isn't in the range?
Yes. We cut, stitch and seam-test in our own Johannesburg facility, so container dimensions, fabric weight, closure type and seam configuration are production variables. Non-standard footprints, heavier cloth on a standard footprint and project-specific seam specifications are routine, typically within days rather than the lead time an imported equivalent takes to land. Minimum quantities apply on non-standard runs.
8.How deep does the toe need to be embedded?
USACE Coastal Engineering Manual and CIRIA Rock Manual guidance recommends embedding the toe container to a minimum of 1.8 times the significant wave height below design water level. This is the single most important decision on the drawing: toe scour removes lateral support and drives forward rotation and progressive collapse of the whole structure, and inadequate embedment is the most commonly documented cause of geotextile revetment failure in the international case-study literature. Verify against project design wave height before any course above the toe is placed.

Specification For The Design, Installation Of FlowTex GSC NW Nonwoven Sand Containers

Site preparation. - Excavate to firm base material over the full length of the revetment section. Remove rocks, stumps, root systems and protrusions and backfill the resulting cavities with sand compacted flush - irregular base surfaces prevent uniform bag contact and create stress concentrations under wave loading. Shape the slope to the design batter angle, toe elevation, crest elevation and rear taper before any container is placed; the profile cannot be reshaped afterwards without disturbing installed work. Establish setting-out pegs at toe and crest along the full length, with intermediate references at each end of the working

Underliner. - Lay a nonwoven filter geotextile over the prepared section, covering the full slope length and the base of the toe trench, before any container is placed. It separates the structure from native soil to prevent fines migration under pore-pressure cycling, and provides a consistent bearing surface for the first course. Lap panels down the slope in a shingle pattern, upper panel beneath lower so downslope flow passes over the joint. Minimum overlap 500mm on stable subgrades, 1,000mm on soft or variable ground. Where differential settlement is expected, sew or thermally bond the overlaps rather than free-lapping.

Toe embedment. - Placement begins at the toe and proceeds up the slope. Set the first container along the front line with its longer dimension parallel to the shoreline - this establishes the datum for every course above, and any misalignment introduced here propagates upward. Embed the toe container to a minimum of 1.8 times the significant wave height below design water level, per USACE Coastal Engineering Manual and CIRIA Rock Manual guidance. Toe scour removes lateral support and drives forward rotation and progressive collapse; inadequate embedment is the most commonly documented cause of geotextile revetment failure. Verify against project design wave height before placing any course above the toe.

Filling and closure. - Fill to approximately 80% of theoretical volumetric capacity. Overfilling prevents units conforming to each other and destroys interlock; underfilling produces excessive deformation and creates voids that concentrate hydraulic pressure at joints. Fill must be clean, well-graded sand free of sharp debris, organic contamination and material finer than the container O90. Fill bottom corners fully without creasing or folding before closing. NW40 through NW1350 are filled by hopper or mechanical equipment; NW1800 and NW4000 may be hydraulically filled in place. All closures are double-seamed - a straight pass followed by a zigzag or overlock second pass in UV-stabilised yarn. Single straight-seam closures are not compliant for structural coastal applications.

Stacking and compaction.- Lay successive courses in stretcher bond, each container offset half a bag length from the course below. Never stack in vertical columns: continuous vertical joints open progressively under repeated hydraulic loading, where staggered placement distributes wave-induced force across multiple units. After a minimum run of three containers, level and compact the course with the back of the excavator bucket or a plate compactor before the next is placed. Double-layer configurations provide approximately 17% greater stability than single-layer of the same grade under equivalent wave conditions. Check face alignment against setting-out pegs at every course to prevent progressive drift.

Crest, backfill and sign-off. - Crest containers take wave run-up and overtopping in addition to direct attack; place them last and with the greatest care. Bench the rear profile to receive each successive course, folding the underliner back over completed sections and overlapping at each bench to prevent flanking flow behind the structure. Complete the crest fill, taper off with specified compacted backfill to design elevation, and level the exposed face with sand. Photographic records are taken of each course before the next is placed under IAGI-aligned QA/QC, producing a verifiable installation record for the full structure depth.

Request a Quote for This Product Family

Upload your BOQ, drawings, or specifications and our technical team will provide a detailed proposal.

Drag & drop your BOQ or drawings or click to upload
PDF, DWG, DOC, XLS, images (Max 20MB each, up to 8 files)

Have a project? Start with us.

Get expert engineering support, reliable material supply, and best-in-class installation.